Mold Specialist

Remark:

1. Quasi-delivery control and assessment of drawings. The drawings used between the new and old moulds directly affect the delivery date of the moulds. The system solves the problem that the new and old moulds can be directly separated when the order is placed, whether the drawings exist or not, and different standard time can be worked out according to different drawings, so as to achieve the effect of monitoring and assessment.

Online:0757-8670 1280

Message
Focus of Die Expert:

1. Quasi-delivery control and assessment of drawings. The drawings used between the new and old moulds directly affect the delivery date of the moulds. The system solves the problem that the new and old moulds can be directly separated when the order is placed, whether the drawings exist or not, and different standard time can be worked out according to different drawings, so as to achieve the effect of monitoring and assessment.


2. Mold backlog control. In the process of mould production, due to personnel, scheduling and other reasons, there are often a large number of unproductive moulds in a certain process, but some processes have not yet been processed moulds, so the production progress of the mould will be delayed to a great extent. For this reason, the system solves the problem that the real-time detailed list of mould orders can provide timely information about mould production progress, current production processes, current production capacity of each process, and so on, so as to better schedule production.


3. Introducing quasi-intersection control of machining and heat treatment. In the process of mould production, machining and heat treatment can be called transfer part to realize the scheduling control of the later process. The system solves the problems of instant reflection, planned delivery, actual delivery and punctual delivery of die and mould, etc. through setting time limit of machining, heat treatment and report of punctual delivery rate of machining.


4. Realize the process line management and control. The system provides die route setting, process setting to process steps. Route tracking of process production can be used as a reference for quality control directly, which has a good effect on process inheritance.


5. Application of employee card barcode to simplify the input of the whole process. Because in the production process, the simpler the input, the better. The system solves the problem of setting corresponding barcode on the employee's work card. After scanning, the input stream number can directly select the process in batches, which can solve the problem of all input and save time.


6. Mould wage calculation, the current wage calculation of die and mould enterprises are meticulous in diameter, steps, process, mould type and so on. Therefore, in many cases, the calculation of die and mould wage is through the workers themselves to register their work and fill in the unit price. If it is necessary to use manual check whether each person has done the corresponding work or not. It's really hard to get the money for your job. Usually pass will be dropped, if personnel changes, more trouble. The system solves the problem that wages can be calculated automatically through diameter, step, process, mould type and so on after production process registration, and wages can be settled instantly at any time.



Four steps to solve the problem:



There are three ways to improve work efficiency: